Our Methodology

TQM tools we apply on every engagement

From identifying a problem to permanently eliminating it, the same closed-loop discipline, every time.

DMAIC
Pareto Principle
Root Cause Analysis
Histogram
Kaizen
Quality Circles
Crosby's Zero Defects
01 — Focus

Pareto Principle (80/20 Rule)

Targeting the vital 20% of defect categories responsible for 80% of project rework, so effort goes where it has the greatest impact.

How we apply it

On a mining conveyor installation, we log every defect by category across a month of inspections, rank them by frequency and cost, and focus the QA/QC team's hold-point inspections on the top three categories that drive 80% of rework hours.

02 — Visualise

Histogram Analysis

Showing how often defects or process variations occur and how they're distributed, so recurring patterns and outliers are easy to spot before investigation begins.

How we apply it

We plot weld defect measurements against tolerance limits to reveal whether variations cluster around a target or drift toward a spec boundary, telling us whether the process needs centring, tightening, or a full capability study before it produces nonconforming work.

EFFECT03 — Diagnose

Root Cause Analysis

Tracing defects to their true source with structured 5-Whys questioning and Ishikawa (6M) Fishbone analysis across Man, Machine, Method, Material, Measurement, and Environment.

How we apply it

When a pressure test failure recurs on a pipe spool, we run a 5-Whys drill from the symptom down to the systemic cause, then map contributing factors across the 6M fishbone to ensure the corrective action addresses the real failure mode, not just the visible symptom.

DMAIC04 — Execute

DMAIC Roadmap

Running structured Define, Measure, Analyse, Improve, Control cycles to convert root-cause findings into verified, sustained correction.

How we apply it

We Define the defect's scope and cost, Measure baseline frequency, Analyse data through Pareto and RCA, Improve by piloting a revised method statement, and Control by locking the fix into the SOP and the inspection checklist so the defect cannot recur unnoticed.

05 — Sustain

Kaizen (Continuous Improvement)

Embedding daily Kaizen feedback loops on-site, translating defect learnings directly into SETA-aligned workforce upskilling.

How we apply it

We embed a weekly 15-minute site huddle where the QA/QC inspector and foremen review the defect log, agree one small improvement, and assign an owner, so the site compounds small gains into measurable quality uplift without waiting for a formal audit cycle.

06 — Embed

Quality Circles

Structuring small, regular workforce-level review sessions so quality checking doesn't depend solely on one QA/QC inspector's availability, so site teams flag deviations as part of their normal routine.

How we apply it

We form a standing circle of four to six workers around a critical process, meeting fortnightly to surface and solve quality issues they see daily but rarely report, turning frontline observation into structured, documented corrective input.

ZERO DEFECTS07 — Prevent

Crosby's Zero Defects Philosophy

Quality as conformance to clearly stated requirements, achieved through prevention rather than inspection after the fact.

How we apply it

We drive adoption through Crosby's 14 Steps, starting with Step 4 (Cost of Quality awareness), Step 6 (Corrective Action), Step 8 (Supervisor Training), and Step 14 (Do It Over Again to embed the cycle), supported by practical workbooks and awareness presentations that make zero defects a daily site-level mindset, not a slogan.

TFF Consulting NPC
Skills Development  •  Regulatory Compliance  •  Quality Management Systems
Terms & Conditions•FAQ••Team login
© 2026 TFF Consulting NPC. All rights reserved.